PHASE 0: $5M to De-Risk the Platform
PHASE 0 DE-RISKING
Converting Opportunity into a Bankable Platform (Estimated 6–12 Month Phase 0 Timeline)
Phase 0 is designed to convert the underlying opportunity into a bankable, institutional-grade development platform over an estimated 6–12 month period. The objective is not simply to prepare a site, but to eliminate the major uncertainties institutional investors and hyperscale operators must resolve before committing billions of dollars to infrastructure.
LAND CONTROL
Secure long-term ground lease and/or option structures incorporating expansion, assignment, financing, and easement rights.
POWER VALIDATION
Validate behind-the-meter generation configurations, power availability, transmission pathways, BESS integration, and utility requirements.
SITE & ENGINEERING & PERMITS
Complete site engineering, infrastructure planning, water & fiber requirements, environmental assessments, and development feasibility.
CROSS-BORDER CONNECTIVITY
Validate & Permit US-Mexico Energy Interconnections & Advance fiber route engineering and cross-border telecommunications infrastructure.
PERMITTING & REGULATORY
Advance municipal, environmental, technical, and other required approvals.
MASTER PLANNING
Architect, Engineer & Develop the campus master plan around Tier 3 and Tier 4 mission-critical AI infrastructure requirements.
COMMERCIALIZATION
Engage hyperscalers, data-center operators, AI infrastructure companies, and institutional capital partners.
Engage institutional investors and initiate Phase 1 infrastructure deployment.

PHASE 1: 100 MW COMPUTE-READY AI CAMPUS
Following Phase 0 de-risking, Korida IA targets development of a 100 MW compute-ready AI data-center campus.
Hybrid Gas/Renewable Energy Generation
+ BESS
The Phase 1 power architecture is designed around a hybrid generation strategy:
Battery Energy Storage
The objective is to create a resilient, scalable power architecture capable of supporting high-density AI workloads while reducing dependence on conventional grid availability.
100 MW of Initial Behind-the-Meter Generation
Strategic Investor Roadmap
From Phase 0: De-Risking to Global AI Leadership
Track our progress from establishing the infrastructure foundation for 100MW → 500MW of AI capacity to building a globally competitive AI and hyperscale data ecosystem.
Follow the key milestones shaping Mexico’s cross-border AI & hyperscale data corridor—from infrastructure de-risking and capacity buildout to strategic global scale.
Phase 0: $5M De-Risking the Platform (6–12 Months)
Institutional-Grade De-Risking
Estimated Duration: 6–12 Months
Phase 0 converts the underlying opportunity into a bankable, institutional-grade development platform. The objective is not simply to prepare a site, but to eliminate the major uncertainties institutional investors and hyperscale operators must resolve before committing billions of dollars to infrastructure.
Phase 1: 100 MW Compute-Ready AI Campus ($150M) Timeline 18-24 Months to energize
Hybrid 100 MW Power Architecture
Post-Phase 0 (Target Start After De-Risking Complete)
Following Phase 0 de-risking, Korida IA targets development of a 100 MW compute-ready AI data-center campus. Phase 1 deploys a hybrid power architecture of 100MW + BESS to support high-density AI workloads while reducing dependence on conventional grid availability.
Phase 02
200 MW Expansion
Target Capacity: 200 MW Total
Phase 03
300 MW Expansion Matrix
Target Capacity: 300 MW Total
Phase 05
Autonomous 500 MW Ecosystem
Target Capacity: 500 MW Total