PHASE 0: FOUNDATION

Securing the Corridor's Future

Establishing the legal and physical groundwork for the Mexico AI corridor. Project launch focuses on comprehensive feasibility studies, strategic site acquisition, and high-level regulatory approvals to ensure long-term scalability and security.

PHASE 0: $5M to De-Risk the Platform

PHASE 0 DE-RISKING

Converting Opportunity into a Bankable Platform (Estimated 6–12 Month Phase 0 Timeline)

Phase 0 is designed to convert the underlying opportunity into a bankable, institutional-grade development platform over an estimated 6–12 month period. The objective is not simply to prepare a site, but to eliminate the major uncertainties institutional investors and hyperscale operators must resolve before committing billions of dollars to infrastructure.

LAND CONTROL

Secure long-term ground lease and/or option structures incorporating expansion, assignment, financing, and easement rights.

POWER VALIDATION

Validate behind-the-meter generation configurations, power availability, transmission pathways, BESS integration, and utility requirements.

SITE & ENGINEERING & PERMITS

Complete site engineering, infrastructure planning, water & fiber requirements, environmental assessments, and development feasibility.

CROSS-BORDER CONNECTIVITY

Validate & Permit US-Mexico Energy Interconnections & Advance fiber route engineering and cross-border telecommunications infrastructure.

PERMITTING & REGULATORY

Advance municipal, environmental, technical, and other required approvals.

MASTER PLANNING

Architect, Engineer & Develop the campus master plan around Tier 3 and Tier 4 mission-critical AI infrastructure requirements.

COMMERCIALIZATION

Engage hyperscalers, data-center operators, AI infrastructure companies, and institutional capital partners.

Engage institutional investors and initiate Phase 1 infrastructure deployment.

PHASE 1: 100 MW COMPUTE-READY AI CAMPUS

Following Phase 0 de-risking, Korida IA targets development of a 100 MW compute-ready AI data-center campus.

Hybrid Gas/Renewable Energy Generation

+ BESS

The Phase 1 power architecture is designed around a hybrid generation strategy:

Battery Energy Storage

The objective is to create a resilient, scalable power architecture capable of supporting high-density AI workloads while reducing dependence on conventional grid availability.

100 MW of Initial Behind-the-Meter Generation

Strategic Investor Roadmap

From Phase 0: De-Risking to Global AI Leadership

Track our progress from establishing the infrastructure foundation for 100MW → 500MW of AI capacity to building a globally competitive AI and hyperscale data ecosystem.

Follow the key milestones shaping Mexico’s cross-border AI & hyperscale data corridor—from infrastructure de-risking and capacity buildout to strategic global scale.

Phase 0: $5M De-Risking the Platform (6–12 Months)

Institutional-Grade De-Risking

Estimated Duration: 6–12 Months

Phase 0 converts the underlying opportunity into a bankable, institutional-grade development platform. The objective is not simply to prepare a site, but to eliminate the major uncertainties institutional investors and hyperscale operators must resolve before committing billions of dollars to infrastructure.

Phase 1: 100 MW Compute-Ready AI Campus ($150M) Timeline 18-24 Months to energize

Hybrid 100 MW Power Architecture

Post-Phase 0 (Target Start After De-Risking Complete)

Following Phase 0 de-risking, Korida IA targets development of a 100 MW compute-ready AI data-center campus. Phase 1 deploys a hybrid power architecture of 100MW + BESS to support high-density AI workloads while reducing dependence on conventional grid availability.

Phase 02

200 MW Expansion

Target Capacity: 200 MW Total

Phase 03

300 MW Expansion Matrix

Target Capacity: 300 MW Total

Phase 04

Global Hub: 400 MW

Target Capacity: 400 MW Total

Phase 05

Autonomous 500 MW Ecosystem

Target Capacity: 500 MW Total