Binational AI Hyperscale Campus
A Cross Border AI Infrastructure Platform Built For The Next Generation Of Compute

Our Mission for Investors
A $5M Phase 0 investment transforms this 260-hectare site into a secure, low-risk 100 MW AI data infrastructure platform.

This ambitious plan is designed to strategically combine U.S. energy and transmission infrastructure with Mexican land economics, power resources, and scalable AI data-center capacity.
THE AI INFRASTRUCTURE OPPORTUNITY
Power. Land. Connectivity. Compute.
AI infrastructure is increasingly constrained by four fundamental requirements.
Korida AI is designed around these four requirements:
POWER
Large-scale, reliable energy available on a predictable timeline.
LAND
Large, strategically located sites capable of supporting hyperscale expansion.
CONNECTIVITY
Low-latency fiber and high-capacity network infrastructure.
TIME-TO-POWER
The ability to bypass conventional grid bottlenecks and accelerate deployment.
The Cross Border AI Data Center structure strategically allocates essential resources across the border, fostering a unified, high-tech commercial corridor.
260 HECTARES
(expandable up to 800 Hectares)
A Large-Scale AI Infrastructure Footprint
The campus controls approximately 260 hectares in a strategic location less than 10 miles from the U.S. border.
The site is envisioned as a multiphased infrastructure platform capable of expanding from initial 100MW AI compute deployment into a larger 500MW+ hyperscale ecosystem.

DESIGNED FOR SCALE
Scalability
260 Hectares 100MW Phase 1 behind the meter energy
Strategic land footprint less than 10 miles from US border.
Scaleable to 800+ Hectares to accommodate Phase 2-5 for total of 500MW
Cross Border Interconnection
Built on established U.S.–Mexico cross-border electricity infrastructure and regulatory frameworks, creating a pathway for scalable power integration across the AI and hyperscale data corridor.
Technology
The architecture is intended to support potential requirements including:
-
High-density GPU compute
-
AI training infrastructure
-
AI inference
-
Cloud computing
-
Enterprise workloads
-
Hyperscale deployment
-
Mission-critical digital infrastructure
PHASE 0
$5M to De-Risk the Investment
Strategic Objective
Phase 0 is designed to convert the underlying opportunity into a bankable, institutional-grade development platform.
Foundation
The objective is not simply to prepare a site.
Mitigation
The objective is to eliminate the major uncertainties institutional investors and hyperscale operators must resolve before committing billions of dollars to infrastructure.
INVESTMENT STRATEGY
A disciplined framework scaling from secure foundations to high-capacity compute environments.
PHASED GROWTH
Mitigating macro risk through modular deployment, starting with 100MW and scaling to 500MW+ clusters.
ENERGY ARBITRAGE
Unlocking land and energy cost advantages in Mexico while maintaining mission-critical U.S. connectivity.